Data centres · 2025
Johor, Malaysia. Busway and digital metering for a 40 MW data hall, installed 30% faster than a cable design.

The challenge
The client needed to energise data halls in phases while keeping every rack row monitored, with very limited ceiling space for cable trays.
Our solution
Mikro supplied 2500 A busway risers with plug-in tap-off units and DPM-38 meters on every tap-off, integrated with the BMS over Modbus.
The results
- Installation time cut by about 30%
- Every rack row metered in real time
- New halls added without shutdown